Shouldn't storage be measured in Joules instead of Watts? Or are we talking about the maximum power output of such facilities? (In which case, the more important number of the actual storage is missing here.)
edit: quote from http://www.mercurynews.com/business/ci_24331470/california-a...
"The 1.3 gigawatts is a capacity target, because different storage technologies have different rates at which they can accept and discharge energy, and the mandate aims to be technology-neutral."
After all, a Watt is simply a Joule/second.
Watts are how we measure power. A Watt second (joule) isn't particularly useful. A watt-hour (or kWh or MWh) makes sense for many industrial processes.
Otherwise we're talking 3600 Joule / kilojoule / megajoule quantities (seconds per hour).
Or multiples of 86,400 per day.
Sensible units aren't always decimal.
"The first tool currently available is to find electricity generators to submit bids to reduce their output, Greenlee said. If that doesn't work, then there's an effort to export the electricity elsewhere — often at negative prices, which means power generators pay someone to take their electricity."
The article is kind of mis-representing the purpose of the system: it wasn't built to store energy from renewables, but rather, to even out demand spikes on the grid. Losing a system like this just means that they've lost a tool for managing fluctuations on a short-term basis. They have to resort to selling excess power at low-demand times (possibly at a loss), or disconnecting generators in order to keep the grid stable. They'll do whatever is most cost-efficient, but both options are probably inferior to the storage system. A big ol' capacitor like this gives the grid manager an extra margin of safety before having to do something drastic to keep things stable.
"There is an average power flow of about 11 GW from the north of the UK, particularly from Scotland and northern England, to the south of the UK across the grid. This flow is anticipated to grow to about 12 GW by 2014.[12]
Because of the power loss associated with this north to south flow, the effectiveness and efficiency of new generation capacity is significantly affected by its location. For example new generating capacity on the south coast has about 12% greater effectiveness due to reduced transmission system power losses compared to new generating capacity in north England, and about 20% greater effectiveness than northern Scotland."
https://en.wikipedia.org/wiki/National_Grid_%28UK%29
Another quote I can't resist...
"Following the unauthorised but successful short term parallelling of all regional grids by the night-time engineers in 1937, by 1938 the grid was operating as a national system."
Imagine hacking the electricity supply for a whole country?
I love how it's the engineer's job to keep everything running, but not to do anything too forward-thinking, lest management get all uppity that it wasn't their idea.
I think it means that they had regional power grids running with emergency links between them (nearest neighbour basis?) already in case a large part of the generating capacity in one region was lost or in case a site near the boundary of one region became disconnected from that region's main line.
One night they decided to try to activate all the inter-regional links so that power from all the power stations was available across the whole country. I got confused by the 'in parallel' bit, but then you would hardly be connecting them in series!
The grids would have been 3-phase and the frequency was controlled to be near exactly 50 Hz, but then you would have to synchronise the phase of each pair of grids before you made the link active... Any electrical engineers around?
This historical incident would make a good magazine article I think.
[1] https://en.wikipedia.org/wiki/Pumped-storage_hydroelectricit...
Initially it had 500 MW of capacity and was later upgraded to 1,000 MW. http://www.egat.co.th/en/index.php?option=com_content&view=a...