Basically, high-voltage electricity is distributed with networks that are dumb and old. The generation and usage is very carefully balanced with heavy users and large producers, because the network does not have storage capacity. It also has very little tolerance for power imbalance, the frequency cutoffs in the old equipment running most of the network are rather severe (in high-voltage networks, frequency increases with more power being fed into the system).
There are already extremely severe network problems in Germany for example where quite a bit of power comes from solar and wind. (I worked as an embedded sw engineer doing software that controlled solar inverters for a while)
The problem with upgrading distribution network is of course the MASSIVE amounts capex needed to replace it.
The other problem is industrial consumers - an aluminium smelter requires a certain amount of power coming in 24/7 or the ovens will freeze and if they do, restart is basically impossible. There are many other factories with similar problems. Given the trend towards just-in-time production and shipping, the chain of events that leads to massive disruption in the global trade can start from a fairly small shutdown with large snowball effects.
I'm not trying to put down green power generation, just saying that getting the price down to reasonable level is just one part of the puzzle.