I'm guessing the sacrifice is roughly equal to the mass of unburnt fuel in the booster at the point of booster separation, but don't much trust my intuition on these things.
I'm guessing the sacrifice is roughly equal to the mass of unburnt fuel in the booster at the point of booster separation, but don't much trust my intuition on these things.
> how much payload is sacrificed by the need to keep fuel
> in reserve for the return to base?
Simple answer: None.A more detailed answer is that building a system which can be reused is an economic proposition. So that the Falcon 9 can lift X Metric tons to orbit for $Y. The way in which they keep the value $Y low is by re-using the first stage. Every satellite project knows the throw weight of all the common launch vehicles and their cost per kilo. And that is how you plan you satellite design.
Now at the moment SpaceX gets 9 merlin engines and the first stage booster back for "free" (which is to say that the cost paid assumed it would be consumed in the launch) but as they learn what they can do they will use that cost savings to offer cheaper launch services (more business) until they have a full launch schedule and then keep any excess value for re-investment.
But an interesting question is this, given that they have a "used" first stage, who would be willing to launch on it? It has no track record and no reliability statistics other than it worked at least once before. To develop that information you need to re-launch them. And I'm hoping that SpaceX will make available some higher risk but lower cost "seats" on those test flights.
Before they get that far, it'd be interesting to see if SpaceX flies a used engine, since they've got "one engine out" capability. Which has already been tested twice.
1: http://spacenews.com/spacex-early-adopter-ses-ready-to-reuse...
You pay to get your payload delivered to a specified orbit. You don't actually buy the rocket.
It's like flying, you buy a ticket, not the plane.
Trying to search for a boilerplate launch contract I found an article[1] where it discusses that Spaceflight Industries bought a Falcon 9 launcher [emphasis mine] which suggests that one buys the entire rocket. That would imply that if they land it, you still own it does it not? Can you then go over to the landing zone pick up your rocket and resell it for parts to offset your original purchase price? :-)
I am really confident that ownership of the first stage is covered in the launch contract if it is returned to the landing field. And the math there would no doubt be really interesting to an insurance company since you have the possibility that the launch is a success and the first stage lands, the launch is a success and the first stage crashes, the launch effectively fails (second stage failure) but the first stage successfully returns, and both stages are lost. That is a number of different outcomes to insure.
Frankly my mind is boggling at the potential legal complexity here.
[1] https://en.wikipedia.org/wiki/AMSAT-OSCAR_16
[2] "SpaceIL has purchased launch services from Spaceflight Industries; an American space company who recently purchased a SpaceX Falcon 9 launcher and will manifest SpaceIL’s spacecraft as a co-lead spot, " -- http://lunar.xprize.org/press-release/israeli-google-lunar-x...
> And the math there would no doubt be really interesting to an insurance company since you have the possibility that the launch is a success and the first stage lands, the launch is a success and the first stage crashes, the launch effectively fails (second stage failure) but the first stage successfully returns, and both stages are lost. That is a number of different outcomes to insure.
The insurance industry already deals with far more complex scenarios. A ship on an ocean voyage will often have the hull and cargo insured separately, different loss layers insured separately (e.g. first 10% of losses, 10-20%, 20-100% all separate), with multiple underwriters on each layer (and sometimes the same underwriter on multiple stamps).
Maybe in England - its never worked like that for any flat I've owned here in Scotland, we have completely separate legislation covering such things:
Even so, a lot of expensive parts on the rocket likely have much longer service lives.
It's actually going to be much, much less than that due to the nature of the rocket equation. https://en.wikipedia.org/wiki/Tsiolkovsky_rocket_equation
I'm happy to be less stupid if that's the problem, but I don't know what thing it was that I did that was stupid.
It turns out when you add 10 lbs of weight to the first stage for reuse you lose approximately 1 lbs of weight from the max payload. (http://aviationweek.com/blog/nasa-cnes-warn-spacex-challenge...)
On the second stage every 1 lb of reuse you lose 1 lb of payload, which is one of the big reasons why second stage reuse isn't really feasible on the F9.