The main differentiation vs a standard datacenter is low-latency high-throughput interconnects, often with a specific or reconfigurable topology. Something like InfiniBand, where you can ensure very consistent, very favorable bounds on your latency and throughput. So think of it as being a "custom installation" or "custom cluster" instead.
Nowadays there really are only a few real choices left in high-performance computing hardware: CPU vs GPU, processor architecture (eg POWER vs x86), and interconnection. Everything else is more or less irrelevant.
I have to admit though, I've always wanted to see what you'd get if you built a Cray-2 with GPU chips (eg Pascal) or Xeon Phi as processing modules. The sheer density of chips Cray managed to cram in that case is impressive.
Glenn Lockwood has a nice blogpost with much more detail: http://glennklockwood.blogspot.com/2013/05/fdr-infiniband-vs...
Depending on topology, you can get ~1 µs latency with Aries. It's based on PCIe-3, so it's different from InfiniBand.
"Chaos monkey" works fine when you're dealing with random cloudstuff and you are in a position to duck-punch your production code. When you have a large dataset that you need to process reliably and predictably, the mantra shifts to "fail never", and that requires engineering up front in combination with carefully-planned maintenance.
Full disclosure: I've worked on this specific supercomputer. While I'm not on the admin team in question, I do work with them occasionally and I have a lot of respect for them -- their job is not an easy one.
Bottom line: If you are using your system to get work done, the trend is to spend the money for reliability and availability. If you want to save money, it comes at a price (but is certainly do-able)
Related: Look at Apple, Google, Facebook, Amazon, Microsoft... they are large enough to build their custom systems themselves. Not everyone operates at this scale. Individuals can buy a cheap PC and build a NAS... or they can buy one from Netgear, Buffalo, QNAP that "jsut works" at a price premium.
The point I wanted to add is that ECMWF, generally acknowledged to be the leader in NWP, also uses a pair of large Cray supercomputers (http://www.ecmwf.int/en/computing/our-facilities/supercomput...).
Note that the Cray XC30 uses Xeon processors and a custom interconnect. The old ECMWF system used IBM Power chips.
[0] http://www.metoffice.gov.uk/news/releases/archive/2014/new-h...
high fidelity weather modelling algorithms are highly constrained by node-to-node communication latency. So their supercomputer probably has some networked-direct-memory-access or another non-standard setup tuned toward passing data between adjacent nodes quickly.