On $400 Hammers, $100 Bolts, and Cost-Plus Contracting
littlebitofcode.com
littlebitofcode.com
For the email example, they said how many servers, how many T1 lines, and how powerful they all had to be. They also wanted usage logs from the T1's for capacity planning. The contractor doesn't have input there.
That's essentially the case with the bolts as well. It's in the specification, the contractor doesn't have the power to say we are going to use these other bolts because they're standard. Items are specified in a specific way for a reason, with bolts, it's because those particular bolts absolutely have to stand up to the rated forces, because they're likely to experience them, with combat and all.
Not really. If you need a bolt that absolutely needs to be able to withstand the rated forces at the specified size and weight, it needs to be non-destructively tested. The expensive part isn't the bolt, it's the testing.
You don't want it to be tested when it's the last bolt left in a redundant pair and it sheers off.
"Why would they say how many t1 lines are need and how many servers? That is silly. What if someone could get the same effect with less power and bandwidth?"
Because they did a needs analysis and calculated the probable amount of bandwidth, and decided that redundancy was necessary as well. This stuff isn't just a guess, it is based on hard data.
The idea was that it costs about $0.35 per piece including design, postage, etc., to send a direct mail advertisement, whereas they could get the entire electronic marketing infrastructure, and pay a fraction of that per-piece. The whole thing was basically a clever pricing structure to get away from direct mail to much cheaper electronic delivery with guaranteed cost savings to the taxpayer because if the system sucked, they just wouldn't use it to send messages. But if it was good, they'd use it instead of the regular marketing materials, saving substantial amounts of money.
Hence why the pricing is higher than it would need to be, because of the risk.
Your tax dollars hard at work, I suppose.
http://www.lessonsoffailure.com/software/military-software-s...
Apparently there was also a $7,600 coffee maker.
This is less true with vehicles, pencils, etc. It is particularly true with IT. I'm not very familiar with the huge weapons systems purchases -- those are probably subject to a lot of other factors since there are only a few firms who can compete.
Part of this is due to the general government skills shortage in IT, but more that the top IT people tend to remain in operational roles, vs. going over to contracting.
The problems happen at the requirements phase -- government asking for very specific terms which exclude functional products, e.g. specifying file formats, number and type of hardware, etc. Sometimes this is for integration with existing government equipment, but more often it is because whoever specified the contract doesn't understand the set of possible solutions. In a lot of cases, too, a 95% solution that is COTS (and thus has less schedule risk, lower cost, etc.) is superior to a 100% solution which has to be custom built.
They HAVE gotten a lot better at this in the 1990s and 2000s. Part of the problem is an essentially limitless budget.
The biggest piece of bullshit that I saw while working there was this: I was one of the few software engineers on my particular team. My code was more concise (by a factor of 3.5 on average) and contained an order of magnitude less bugs than the team's average bugs per sloc. This was expected because I was one of the few software engineers, it makes sense that my code would be better than a non-software engineer. I was approached by someone in a position of authority and told that the work I was doing was great, but I needed to slow down. I was told "I wasn't earning my value.", which is code speak for "You're working too fast, and if you slow down we can charge the government more because we bill by the hour."
I quite last September and haven't looked back.
It's hard to design a contract that gives the right incentives to the right people. Because the government is essentially banned from using goodwill and reputation as a basis for buying decisions (as it gets called cronyism and/or the old boys network) they are stuck trying and failing to enumerate a fair contract instead.
President Thomas Whitmore: I don't understand, where does all this come from? How do you get funding for something like this?
Julius Levinson: You don't actually think they spend $20,000 on a hammer, $30,000 on a toilet seat do you?
Isn't that what a classified budget is for?
1 Lockheed Martin Corp. $14,983,515,367 2 Boeing Co. $10,838,231,984 3 Northrop Grumman Corp. $9,947,316,207 4 General Dynamics Corp. $6,066,178,545 5 Raytheon Co. $5,942,575,316
Here are the CEOs of those companies...
http://littlesis.org/person/1931/Robert_J_Stevens http://littlesis.org/person/1418/W_James_McNerney_Jr http://littlesis.org/person/1052/Dr_Ronald_D_Sugar http://littlesis.org/person/2363/Nicholas_D_Chabraja http://www.raytheon.com/ourcompany/rtnwcm/groups/public/docu...
All white men, if anything they should up the affirmative action programs in my opinion. Oh, and stop spending so much of our money on military and start putting it into public healthcare and education.