Most long haul fiber cables pulled these days are way more than 48, at minimum 144, 288 or most commonly 864 strand ribbon. If you're trenching 300 km of fiber along a railway the cable itself is actually a small fraction of the total project costs. At most a 5% delta between 72 and 288.