They're putting an awful lot of faith in that counter though if they allow 255 and 257 that means that they expect to never miscount an axle.
They're putting an awful lot of faith in that counter though if they allow 255 and 257 that means that they expect to never miscount an axle.
In the old times there was a manned caboose car at the end which job was to ensure the completeness of the train (and that switches are cleared).
Here's an example of such an SBB car decommissioned some centuries ago http://www.bahnbilder.de/bilder/gueterwagen-266906.jpg
Video (1986) https://www.youtube.com/watch?v=ev4szZ4iNTY
The US probably has a different term.
Even in this 1955 fire training video you can see they care more about the locomotive than the safety of the crew: https://www.youtube.com/watch?v=hkUQ3rTfU4s
tldw: crew were expected to enter the confined area of the engine room in the middle of a fire and turn at least two valves (that have complex interactions with each other) filling the same confined area with CO2.
Still, given that the warning was issued quite explicitly it would seem that the designers of the operations guide definitely thought it was possible to have a train that long. Otherwise, why bother with the warning?
I don't think that conclusion is warranted.
As soon as there are lives on the line the amount of thinking about undefined situations skyrockets. Even so, given that the system fails 'positive' (as in: it can't register 'no train' when there is a train, it can only register 'train' when there is none) I'm quite impressed with the foresight to even think about that exact possibility occurring.
Another field where you see this kind of planning is in medical electronics and software systems.
I've also bought some medical electronics surplus for parts in the past and it was absolutely bullet-proof. Top quality.
Edit: Im just taking an infusion pump to be serviced. This model is well liked. However when you want to deliver a drug bolus at a very specific time point during an MR scan the pump may deliver it, or it may give and error as its timed out. There is no way to tell prior to pressing "bolus". Not ideal.
Maybe sometimes...
Decades, perhaps? (A decade is ten years; a century is one hundred.)
Do bogies with uneven number of axles even exist?
Voilà.
(Not Swiss, just the first train car I could find with 3 axels)
You can definitely build long enough trains to blow past the limit several times, coal and ore trains are routinely 100+ cars long (with each car having at least 4 axles), the record is a BHP Billiton Iron Ore train of 682 cars and 8 locomotives.
[0]: http://bazonline.ch/schweiz/standard/Zwei-Haende-bremsen-den... (German)
With ETCS [1] there are no "fixed" physical block segements anymore. They are simulated in software and allow a much higher densitiy of trains and also longer trains. While SBB is highly motivated to roll out and migrate their legacy signalling systems, it's still a long way. The new Gotthard Base Tunnel is already built ETCS-only.
1,2,3,...,254,255,0,1,2,3...
1 byte.
Although it is mentioned in the comments to the linked article that it is probably an electro-mechanical counter, so I am imagining a four wheel encoder with each wheel having 4 positions (although could be 8 wheels with 2 positions per wheel), electrically readable, and reset-able.
Ditto for 255 with a single 'bounce'.