>A section of workspace in the circular, Norman Foster–designed building is finally move-in-ready: sliding-glass doors on the soundproof offices, a giant European white oak collaboration table, adjustable-height desks, and floors with aluminum-covered hinged panels, hiding cables and wires, and brushed-steel grating for air diffusion.
>The first prototype was ready in the summer of 2010, with pictures of trees on either end of the central area to evoke the landscaping and proximity to the outdoors. Jobs himself set the precise dimensions of the openings from one end of the central area to the other. The team quickly discovered that early versions of the small offices on each side of the central area were noisy—sound bounced off the flat wood walls. Foster’s architects suggested perforating the walls with millions of tiny holes and lining them with an absorbent material. In the completed section of workspace, Ive snaps his fingers to demonstrate the warm sound it creates.