So now we are talking high sea docking to a moving structure in the North Sea, not going to happen in the winter. So any incident and you lose your entire season, and now you're in a downward spiral. I'm not saying this won't work, I'm saying it's a very complicated situation.
As someone who presumably works a bit more than you in the offshore construction industry, I'd love to see you quantify these statements. Especially since you imply them to be industry-wide, commonplace blights.
Woah there. I'm not picking a fight with you. You make some pretty bold claims like "they deliver insufficient foundations." Tolerances for verticality, foundation position, etc. are contractually obliged and delivered overwhelmingly with success.
>would be constructive and explain how the yaw works on floating systems?
"Floating systems" is too broadly undefined to give you an answer. Could be that the mooring design resists yaw motion within certain tolerances. Could be that yaw motion of the base is compensated by a rotating nacelle.
I think you're being evasive.
Do you think they have not thought about these problems as much or as effectively as you have?
How much have you thought about it, what expertise are you comparing to this company's proposals, and how do your proof of concept deployments compare to theirs in terms of size, scale, and longevity?
Yes, the marine environment is harsh. Corrosion is an issue. Maintenance is challenging. But these are not new problems: these are solvable (and solved) engineering challenges. The O&G industry has considerable overlap with offshore wind; foundation design, transportation and installation, etc., all well-understood and in practice for literally decades.
I haven't read the report you cited, but it is already 5 years old (much has changed in the past decade). The wind farm performance degredation they speak of in Denmark and the UK might have a lot to do with outdated technology of these older turbines. The first offshore farm in Denmark was built in 1991. Technologies since even 2010 have greatly improved.