The problem is that utility company distribution system operators can issue clearances (ensuring a de-energized state) on their systems disconnects, but not on individual home system disconnects. Its not a tough problem to work around though, all the troublemen would have to do is to ensure the line is dead before installing their shorts and grounds, if the line wasn't dead, they'd stop work and figure out which network was backfeeding the line they were trying to work on.