* For example, Agua Caliente Solar Project, located in Arizona near the 33rd parallel and awarded for its excellence in renewable energy has a nameplate capacity of 290 MW and an actual average annual production of 740 GWh/year. Its capacity factor is thus: 29%
* A significantly lower capacity factor is achieved by Lauingen Energy Park located in Bavaria, near the 49th parallel. With a nameplate capacity of 25.7 MW and an actual average annual production of 26.98 GWh/year it has a capacity factor of 12.0%.
https://en.wikipedia.org/wiki/Capacity_factor#Photovoltaic_p...
I often gripe about people using the word nuclear to describe exclusively fission, which is regrettable for those of us keen on encouraging research in fusion.
The use of the word 'solar' to describe exclusively PVCs is comparably regrettable.
Solar thermal is pretty much guaranteed to trump PVCs at the moment, albeit at a higher capex.
From the article:
> Capacity factor measures a generation unit's actual output against its theoretical maximum output.
So this would be a percentage of your theoretical maximum, never exceeding it, by definition.
I would've presumed the theoretical maximum for a producing unit would be what it could theoretically actually produce in the location its placed. If it's the theoretical maximum output of a cell, then calling BS seems warranted, but it doesn't seem like that would be a useful comparator in this context.
http://sinovoltaics.com/learning-center/quality/standard-tes...
Those conditions reflect not the theoretical maximum but an expected output in very good actual conditions.
This is relevant because it relates to the needed transmission capacity one need installed. For instance, at 30% capacity factor, you're "wasting 70%" of transmission on average.
It's a good metric to compare between sites of a same energy source but it's not very useful between sources. For that, the better metric is Levelized Cost of Energy (LCOE) in $/MWh. Usually present with or without subsidies.