In fact I would advise you to hire the design first separately and only after you have a design get bids on the install. My grandpa got bids from several design/installers, and only after the contract was signed did he discover that all the design/install bids in the county were for a more expensive mound system. My uncle next door learned and hired the design first and then tracked down the one installed in the county that would do the cheaper system that was designed.
So digging a well, would save over 5k for water, plus the monthly charges. I guess I should have specified. I thought saying "Dig a well" was relatively self explanatory in the fact it would likely save money not only in the short run but over the long run as well.