That's not a fully accurate situation.
The most damning thing is that FirstEnergy didn't realize their system was falling apart. They lost alarm notifications at 2:14, and didn't realize that things were bad for another hour and a half. The first transmission line to fail completely [1] wasn't discovered by anyone until after the blackout, and FirstEnergy was called about the first transmission line failure but they dismissed it as a fluke because they received no notification of its failure. It took several people calling them asking about line failures before they realized that they weren't seeing their internal notifications, and by that time, their system was pretty much one minor thing away from disaster.
The only actual recourse they would have had at that point would have been to start disconnecting people from their system. That takes time, and by the time they realized that they were in such an emergency, it was too late. The system was already collapsing and the full blackout was just 20 minutes away.
[1] The Star-South Canton transmission line crossed company boundaries and failed twice then immediately automatically reconnected before failing for good a third time. The first failure precedes the Harding-Chamberlain failure, while the other two failures occurred after two lines were off for good, so this line's failure is considered the third failure.