Also, I'm not even an engineer and I can tell you that uneven strut design would give you uneven loading on the span. Christ. Why didn't they just build a damn cable stayed bridge?! If traffic was a concern, they could have built it half cantilever, half guyed. No formwork, strong, still visually appealing, no stupid truss design, and no concrete.