And thanks for pointing out that reliance on precision engineering might have led to safety factor reduction due perhaps to overconfidence...
And thanks for pointing out that reliance on precision engineering might have led to safety factor reduction due perhaps to overconfidence...
To give a different example elevators/lift (those using rope cables) have usually cables that have a factor of safety 5, but they have nonetherless additionally at least one set of independent brakes.
Back to bridges and more generally reinforced/pre-stressed concrete structures, in my experience modern methods of calculation are more precise than old ones, and allow usually - given the same loads/hypothesis - to save (i.e. there is less rebar steel and cable steel) between 5% and 10% steel and/or concrete.
In practice with old methods of calculation there was a 1.05/1.10 "implied" and "hidden" additional safety factor.
Safety factor = "it only fails if the bridge is full of heavy trucks and they all are overloaded 2X"
Redundancy = "we have 6 stays and any single one can snap and the bridge will stay intact"
Airplane wings cant have either. Because safety factor higher than 1,2 would make the plane too heavy to fly. And redundancy from multiple wings would make the system aerodynamically so unstable that snapping a single wing would still cause a crash.
In those cases you need to have very good testing program before installing the structure. And then you need a good inspection program to protect against fatigue and corrosion. The latter was missing in this case.
An engineer may say things like “if you build it this way, do this maintenance, it will withstand 100 year events for its service life of 50 years”
You see that (in a slightly different form) with storage media. A SSD drive with a mean time between failures of a million hours typically will have an life expectancy that is significantly shorter (https://www.controleng.com/single-article/learn-or-review-th...)