https://www.seamlessbayarea.org (From SPUR)
Does it? They parallel each other with less than a mile between down most of the peninsula.
Bart lacks tracks for passing (though this could be added in new construction), and the Daly City route is a detour for most commuters looking to go to Downtown SF, so it's slower than most Caltrain trains.
Caltrain's also been able to handle capacity issues better because they buy off-the-shelf cars.
It seems more cost-effective to grade-separate and electrify Caltrain and run the extension to the Transbay Terminal. And fix the Transbay Terminal.
Maybe you're thinking that it's just impossible to have shallow tunnels at all with the type of soil? I don't think that's how things work, but I'd love to hear from an expert.
It's typically cheaper and faster, as it requires very little in the way of special equipment or personnel. The downside is that it requires cutting up the road. The "bitter pill" here is the several years of traffic disruption that would be required.
The BART Berryessa Extension was above ground (even cheaper) and still cost $230 million per mile. So, yeah, I doubt cut and cover would be anywhere close to cheap.
Cut and cover actually doesn’t really use ventilation; with enough openings to the sidewalk, trains will create a natural piston effect cycling air in and out of tunnels. That’s how the NYC subway operates.
Yes, my point exactly. Underground construction is not cheap.
That’s been the plan since the 1970’s.
Maybe they should have built the high-speed rail like they wanted at that time. It becomes more difficult and expensive as the decades progress.
I understood the article.