About 1/3 to 1/2 the power usage is leakage and I don't see how a clockless design will help that. We dynamically lower the voltage and have power islands for unused or lesser used portions.
nbingham makes a great point about the tools. We have invested billions of dollars in tool flows. We are not going to throw that away until we see some proof that clockless designs are better in some measurable ways.