>> a pipe segment had been replaced with PVC instead of copper
Which is why when you do that you are supposed to always install a wire to jump over the now non-conductive section of pipe.
Which is why when you do that you are supposed to always install a wire to jump over the now non-conductive section of pipe.
I first noticed the issue with a stepper motor project I was working on. It was very interesting to hear the reduction in audible noise from the motors when the grounding was fixed.