Really like how they minimize wear to the pavement by just shifting the location of where the robot operates each time through a cycle.
One thing we have barely started uncovering are these “2nd order” problems that come with automation.
I would also imagine the next generation could include using thinner pavement where they know that the robots would never go through, as this should drastically save on material.
If in doubt over engineer. When handling use cases be in doubt.