There are mainly 2 categories for stoves, but I don’t think a 2 phase option exists: (source: just bought one)
1. ~7.4kW with a double group (4 pins) connection. That gives you 2x16A, but is still only one phase, just split over 2 fuses.
2. 10kW+ with a 3 phase connection (also 4 pins), in this case it actually is using 3 phases.
Dutch prices are regulated. The annual fee for a 3x25A connection is the same as for 1x40A. The next step at my grid operator (3x35A) is much more expensive.