The point is that it cannot be.
On a 8 hour work day on federal minimum wage that's only 52 workers being able to work on the entire project ignoring all machine and material costs.
Too right it couldn't be done today. Or there were a lot of costs accumulated by the project that were not assigned to the project.
Still the reported cost of the road at the tune excludes machinery and labour costs, it was purely material costs.