A New York railroad uses lasers to stay on schedule
thedrive.com
thedrive.com
https://www.popularmechanics.com/technology/infrastructure/a...
2002
https://www.laserfocusworld.com/fiber-optics/article/1655239...
https://www.youtube.com/watch?v=Kh6U4QJmutA
"all thanks to pioneering laser technology that most railroads are too scared to try out."
No. Most railroads are not scared of lasers. Those with the business case for this tech use it. Those without do not. Maybe "most" American railroads don't use these things but the reasons behind that are probably more political than fear-based.
From 2014:
"North American freight railroads, in general, have accepted the degraded performance debris can cause. Most of the current solutions are not efficient for the amount of territory and service required. A road vehicle with rail wheels based cleaning system would be most useful, allowing one or two workers to concentrate on the worst locations and move between trouble spots quickly.
- Steven Belforti, Guilford Rail System"
https://www.newscientist.com/article/mg22429984-800-locked-o...
> 90.7 percent of trains were on time in November, an improvement of 3.8 percent over last year
The metrics used by the LIRR were so disconnected from reality that the state actually passed a law this year mandating that they had to adopt meaningful standards.
https://www.newsday.com/long-island/transportation/mta-lirr-...
The entire LIRR system is plagued by cancellations and delays on a daily basis. There's nothing quite like standing on the train platform looking at the little digital sign that says, "the 7:08 to PENN is on time" while you look at your phone and see its 7:25 and the train is still nowhere in sight.
There are lots of remote switches that just have a big propane tank to keep them clear of ice.
Because switching shakes the train around, sometimes a block of ice from an ice storm 1000km away can dislodge and jam a switch until it’s clear or melts away.
Except the switch has to be in the correct position first to get a train over it. The rail lines in NY including the subway just use natural gas heaters on most switches.
Propane/natural gas switch heating is like sitting in-front of a campfire, while electric would be like having a heating pad on your skin.
Or maybe the electric ones are just blowers too with one central heating point and a bunch of vents. Dunno.
I suspect any of these mechanisms, however they work, are going to be wildly inefficient. The very premise of melting ice outside in the winter on big pieces of metal exposed to the elements seems like a huge energy sink. Whether electric heating is sufficiently more efficient to offset the inefficiencies in power generation and transmission I couldn't say, but it's far from clear to me that the 'American method' of using propane is crazy.
Higher grade industrial elements might last longer, but nat. gas is going to be significantly more cost effective in the US
I'd love to see how they avoid needing eye protection for people near the train tracks in the field (presumably some shielding and very careful laser alignment?).
I'd be particularly interested in whether the lasers are safe on overhead tracks near populated areas (certain MTA lines in New York are like this).
The current solution in most of the world is essentially high-pressure jets of water to clean the rail; obviously you eventually reach a point where you don't have enough pressure to dislodge the goop.
Sandite is used in many places, which essentially adds some sort of metal shot and antifreeze to the sand. The goal is essentially that this mixture will be interspersed with the leaf gunge that accumulates over the day and both provides better traction (sand, antifreeze) and helps any track circuits to continue to function even when the tyres are unable to make direct contact with the rail (metal shot).
Yes, if you get the leaves off the rails, there should never be any oil, but if some slip by your back where you started.
California has electrical wires entangled with dry trees after years of drought. (Trees are tricky, since it takes years after installation for them to grow tall enough to reach the power lines. In the NE I've seen power outages caused by tree branches laden with ice from freezing rain sever power lines.)
https://media.wired.com/photos/5932717eb8eb31692072f8f8/mast...