It's just a question of what is cheaper or faster to achieve. I don't know enough details to say either way.
The question is: at what level of carbon taxes would nuclear displace gas, vs. what level would renewables + storage displace gas. In the US, CO2 taxes would have to exceed $300/ton for new nuclear to displace gas CC baseload, and for intermittent applications the needed tax would be far higher.
If people are willing to pay enough for the 20% of time that nuclear stays in business. If not, we make do with just renewables.
The practical issue how how the nuclear plant sells electricity can be handled either with contracts (they could sell electricity to resellers in "one month of continuous production" types of units) or by running them in load-following mode, french/german style, whichever is more profitable.
In practice it seems fairly likely that there are many electricity applications where is pretty inelastic up to at least 10x current cost, so there will be demand for some amount nuclear power.
In any case, going forward, France's cost for new reactors are as exorbitant as in the US, if not worse. The new reactor at Flamanville has been a disaster.
At an exchange rate of 1 franc (1993) to 1 usd (1993) and 1 usd (1993) to 1.77 usd (2019), this yields a cost of 120 billion dollars. Not bad to decarbonize the electricity supply of a country with a GDP more than 1/8 that of the US.
The nature of construction nuclear plants (and many other engineering products) is that that serial production is cheaper than the first several models, since the cost of development needs to be recouped. There are only 2 EPRs in operation and 4 in construction. By comparison, during the Messemer plan, 30 reactors of the same 900 MW design and 20 reactors of the 1300 MW design were constructed. This isn't counting reactors exported to different countries. Of course first 6 EPRs are going to be more expensive per unit as compared to serial runs in the dozens.
Nuclear is not uneconomical just because it only needs to run 50% of the time. That would just mean the price is double; there's no technical obstacle there.
If twice as expensive is too expensive to compete with batteries (it is not), then nuclear is not economical period.
Renewables + batteries, and + hydrogen for rare lulls/seasonal storage, will leave no place for new nuclear. The system will optimize out to 0% nuclear, once existing nuclear plants are gone.
The optimum winter angle in Massachusetts is just 24 degrees from vertical! That angle is so crazy steep that it can't possibly collect snow, but it generates several times more power than the rooftop panels that make up ~80% of MA solar. Since the total sunlight is 3.5x weaker in winter and demand is much higher, that's hugely important.
The darkest winter months between October to February (~4 months total where insolation is ~1/2 annual average) would mean virtually no solar if MA does not build utility scale plants. Nuclear and wind would be flat out the only ways to supply that without emitting CO2. However, if panels are angled for winter use they can easily outcompete nuclear. Nuclear running 4 months per year would cost 3x as much as normal. Overbuilding solar by 3x and angling it at 24 degrees would cost over 3x as much and generate less than the nuclear (because of cloudy days), but all that power would be available year-round at no extra cost. The amount of storage required would be almost the same, since it only needs to account for the shorter length of the day.
A consequence of this will be that power will become very cheap much of the time. If you can consume power intermittently you'll be in a sweet spot.