How long does it take for a coal plant to ramp up or down? I wonder how much battery buffer you'd need to have the plant work on a pure control theory basis instead of long term forecasting?
Different plants have different ramps depending on where they are in their output curve, how hot they (or various parts) are, and how their operators want to run them (max ramp is generally higher than economic ramp) but, while it isn’t my business to know this stuff anymore, IIRC it is 2-5 MW/min for coal. This is ignoring the control loop.