No, it doesn't. It only takes a few years. What takes decades is resolving all the NIMBY lawsuits.
No, it doesn't. It only takes a few years. What takes decades is resolving all the NIMBY lawsuits.
A PV field, on the other hand, is much simpler, with much more inherent redundancy, and can tolerate construction mistakes without either safety implications or substantial loss of capacity.
Olkiluoto 1 and 2 were both built quickly and on schedule. Mainly because they were already proven designs with tens of other units already built around the world (and the second reactor is practically identical with the first one)
The second exact same one is actually Flamanville 3, the other one with the massive cost overruns.
I'm pretty sure they have no NIMBY lawsuits to content with, so this seems like a realistic timeframe.
[1]: https://en.wikipedia.org/wiki/List_of_nuclear_reactors#China
By the time we build expertise it will be 2080. And all that capital will be tied up until then. Who even knows if fission will be the right tool then.