Is this a similar type of standard Professional Engineers are held to? I'm sure they don't, e.g. design every member of a bridge and do the stress calculations by themselves, but when it comes time to certify the design, the PE (and the PE alone, if I understand the way it works correctly, regardless of how many people worked on the drafts) is the one upon whom the entirety of the blame lies should the bridge collapse.