3D printed house in 48 hours
reuters.com
reuters.com
I started thinking about buying some land and building some kit A frame home for glamping, and it seems like the grading, foundation, plumbing, windows, interior, etc are all a bigger cost than the walls. I never realized this before looking into it.
“Andersen said the actual printing time for the walls took about 48 hours, part of an overall eight-day process to build the entire home.”
It strikes me that the part of the house building this aims to improve is one of the cheaper parts of house building. I suppose it ultimately saves on time, although with enough carpenters, they could get something done in far less than 8 days.
If they had built a duplex or triplex it would have been a net gain though.
But I just don’t grok it... a pre-fab can be trucked in and thrown together in a couple days, plumbing, electrical, and all.
I would slury the earth on site and extrude clay, also thinking about a foam extruder that could print cacuoons for the unhoused with an embedded solar panel.
Good to see progress in standard construction.