I have no idea what HVDC underwater cables cost, their maximum voltage, nor their losses, so let’s go with your original figures, and the worst case: 35% losses.
The average of the BNEF 2021, Lazard 2020, and IRENA 2020 studies says that utility scale solar costs $48/MWh while nuclear costs $164/MWh:
https://en.wikipedia.org/wiki/Cost_of_electricity_by_source#...
35% loss would make that $73.8/MWh.
At these distances I must assume the grid itself is a non-trivial cost, and estimating that cost certainly deserves a lot more careful thought than I can put into one comment, but that grid would have to cost effectively more than $90/MWh to be worse than nuclear.