I don’t complain about how slow NBN Co was. I complain about the fact that it was meant to be FTTP instead of FTTN (premises vs node), and that the only reason it didn’t end up that way is that the Liberal party said basically exactly what AT&T are here: that ADSL2 speeds are enough, and those last miles from the node to premise can be delivered over Telstra’s existing (horribly degraded and unmaintainable) copper network.
So, instead of 95% of the population having gigabit fibre, we have this hodgepodge of FTTP, FTTN with the last hop over 5G, and FTTN with the last hop over copper, all of which cost the same and which you get depends on when it was installed.
Don’t get me wrong, the NBN is certainly better now than the ADSL of old, but it ended up costing significantly more for the mess we have now than it would’ve if we’d successfully seen FTTP through from the start.