It’s 20,000 tons in stage 1 which is still huge.
https://investingnews.com/company-profiles/controlled-therma...
Hell’s Kitchen is expected to have a minimum 30 year life. Stage 1 of production is slated to begin in 2023, with a 20,000 tonnes per annum lithium hydroxide facility along with the generation of 49.9 megawatts of renewable energy from the integrated geothermal power plant.