Edit: Here's a second video [1] where they use concrete. It says that factory can makes enough for 60 houses per year. It also says, at the end, that it's not cheaper but faster and "easier on the nerves" for the builders.
Edit: Here's a second video [1] where they use concrete. It says that factory can makes enough for 60 houses per year. It also says, at the end, that it's not cheaper but faster and "easier on the nerves" for the builders.
If you can engineer out some of the potential delays that can take a huge amount off the overall cost.
This sounds like a problem with the process and contracts, not something that cries for a technological solution.
Also prefab houses have a lead time of about 6 month.
But once the on site build has started it's fast and those elements come with electrics, water piping and (sometimes) windows preinstalled. They just need to be connected.
You basically have the choice between the classic building methods with an architect and contractors, or an All-in-One Firm that has it's own contractors and almost always uses the prefab model. The later also is way less hassle for the once-in-a-lifetime home builder, usually.