It seems they attach a charger while they lower the ramp fir unloading and disconnect it just before leaving.
The unload / load process seemed as fast as before to me but I haven't used ferries a lot since before covid.
I also guess they might do slightly longer maintenance charging cycles at night since there are fewer departures then.
I read about maybe the first electric ferry, that the grid could not supply the power demand when speed charging the ferry. A new power line with greater capacity was then build.
Grid operations are generally better off with lower peak demands.
https://www.youtube.com/watch?v=Kc2CBGVa_kw
Worlds largest electric ferry connecting to a automatic robotic charger station
Here it says "5 minutes" for charging (15 minutes trip):
https://press.siemens.com/global/en/feature/pioneer-position...
"At nearly 98 meters long and 16 meters wide, the Elektra can transport up to 90 cars per trip. The ferry purchased by FinFerries will now be traveling this route every 15 minutes. The batteries will be charged in roughly five minutes while cars move off and onto the ferry. The two lithium-ion batteries each have a capacity of 530 kWh. "
7 MWh is a pretty beefy battery, I am going on the assumption that its size was carefully chosen to give it sufficient capacity during the operating life of the vessel to serve its route. Filling that up from an industrial drop at 20KV with 100A is doable in under four hours.
In this case they 'crew' the boat from the shore, which will probably work well as long as conditions are good, but I'd hate to be in the driving seat of one of those and to see the comms link go down.