Vaporized into what? Something that you’ll have to keep heated to 5000c for 20km until you can vent it?
A 20km borehole with a 10cm diameter is only ~157m3 of rock. If the dig takes four weeks (which would be unprecedentedly fast), you only need to purge ~64cm3/s, which is pretty trivial.
They'll need to do something like mix the dust into concrete. Silicate dust is a respiratory hazard. But that doesn't strike me as a significant hurdle.