> If the situation so requires, we would have to replace waste heat mainly with Russian natural gas and light fuel oil.
Why wouldn't this just be using the electricity freed up by not powering the data center? Thermodynamically, the data center is just a resistive load, so assuming the electrical distribution system can handle the load, it should be a drop-in replacement.