Let me be more careful.
There are two methods to throttle nuclear plants: by control rods, moderating neutron flux, and by temperature, moderating coolant flow (in, say, a pebble bed reactor). Either of these work well for generating heat, though coolant flow is simpler technically. Beyond this the plant is a steam turbine, which would have the same maintenance problems as any other steam turbine designed for the load. It's not as fast as gas, but the fuel is cheaper. But as DabAsteroid pointed out, Nuclear Plant are typically base loaded, in the US at least, so that's not terribly relevant.
I don't understand enough of the specifics of the particular designs Dab alludes to to comment on reactor poison buildup. I know that in pebble bed reactors throttling was intended by design.
I think that within the US market (which was, erroneously on my behalf, what I assumed the conversation was about), the point of new power plants not being yet created still holds: whatever load balancing one would need is an investment already made. (though this is mostly irrelevant to the point of discussion where nuclear plants don't supply peak demand). Of the proposals for which nuclear plants would supply peak power, the question is still out there: how will they balance the load? There are many possibilities, but they're mostly guesses. There is, increasingly, a diverse market for load balancing technology, and companies, struggling with technology and sales and tradition and economy, to try fill that need.