I would consider living in a division that has extra low-cost electricity. It couldn't be zero cost because nuclear could only provide base load power, unless one of these micro/modular reactor types is so innovative that it can provide base and peak load power, in which case such a division could have truly zero-cost power for a bunch of years.
I.e., promote the darned things, loss-lead if need be.
If the manufacturer won't take such risks, then might never break through.
I bet that after a few years you could get such good press out of it that other developers might sign on.