NASA's Exploration Ground Systems – We are in our planned hold at T-10 minutes
twitter.com
twitter.com
We are in our planned hold at T-10 minutes. Currently, the upper stage liquid hydrogen is 78% filled.
Core stage has been topped off – both liquid hydrogen and liquid oxygen are 100% filled.
The ethernet switch has been replaced and will be verified.