Take Sea Doo jet skis. You have to dig deep in their website to find a reference to their Canadian origins, even harder on Ski Doo's website. And one would expect that Canadian heritage would be a plus for a snowmobile.
As far as "national pride" goes there is a big difference between the US vs CA.
Here (Canada) you would be hard pressed to find cCanadian flags. Really only two places fly them, government buildings (schools, offices, etc) and US big box stores (walmart?).
I lived in the US for ~6 years and this "flag" thing really stood out at first. Like i'd drive around and there would be bridges basically covered in flags. This is something you will pretty much NEVER see here.
[1] https://en.m.wikipedia.org/wiki/Prices_of_chemical_elements
I responded to this question as well and it seems the plant near me took $1.5 billion for the heavy water.
After a bit of digging, it turns out it has approx. 500 tons of Heavy water.
The higher price kennend3 found could reflect the fact that Canada manufactured its own heavy water for building CANDU reactors in the 20th century whereas today there is more heavy water manufacturing capacity, including a large and relatively new plant in India: https://www.hwb.gov.in/heavy-water-plant-manuguru
I expect several gigawatts of electrolytic hydrogen capacity to be built this decade for supporting "green" production of steel and ammonia with renewable electricity. Plant operators could also invest a modest effort to extract and concentrate older electrolyte batches, providing a new low cost source of heavy water. Note that this is a very energy intensive way to get deuterium, but it could be low cost because the capital and operating expenses are mostly accounted for by the plant's primary purpose (hydrogen production). The marginal cost to add a side business of heavy water recovery would be much smaller.
[1] https://en.wikipedia.org/wiki/Norwegian_heavy_water_sabotage
Like, nine guys went in and blew up the plant, and then skied across the trackless wilderness to neutral Sweden. All the while working under conditions that might be charitably described as austere.
I reread it every couple of years and cannot recommend it highly enough.
"Total capital costs including interest were $14.319 billion CAD (about US$11.9 billion) with the heavy water accounting for $1.528 billion, or 11%, of this. "
$1.5 billion (CAD) for heavy water seems like a LOT of money??
That means heavy water contributes a total of 0.8c/kWh.
The cost of raw Uranium is between $0.0015/kWh and $0.000015/kWh. [1]
Disposal is like $500/kg, and 1kg gets you 315000kWh (0.16c/kWh).
Once the very expensive reactor is up and running the costs are very, very low.
[edit] Study pins it at 20% of the plant up-front cost.
[1] https://en.wikipedia.org/wiki/Economics_of_nuclear_power_pla...
[2] https://inis.iaea.org/collection/NCLCollectionStore/_Public/...
Which exceeds the LCoE of a brand new solar plant.