That slow? This is a half of a single average wind turbine.
Tesla already has supercharger sites with over 50 dispensers capable of 250kW. In the UK gridserve has built a charging site with a 10MW solar array, battery storage, and 350kW chargers. Fastned has many 10 x 300kW charging sites in west Europe.
However ICE trucks and cars will continue running for years to come maybe only prohibited in city centers which is fine.
Still the Russia vs Ukraine situation show how europe is vulnerable and dependent of gas from Russia and Africa. This will only give more leverage to external forces to influence european politics.
This year is the very first one when people were asked in some parts of europe to reduce their consumption and prepare for potential outages during winter. Depending on the geopolitics, things could improve or worsen. A nuclear plant do not get build in 6 months.
Or you could put up wires on highways which means trucks can charge as they drive along. Germany, Sweden, the UK have been doing trials on this
https://www.carscoops.com/2021/07/uk-approves-e-highway-sche...
"An academic study suggested the e-highway system covering all but the most remote parts of the UK could be completed by 2030 at a cost of £19 billion (£26.4 bn),"
In context that's about the same cost as Crossrail.
https://new.siemens.com/us/en/products/energy/topics/transpo...
Probably they want to halve the times in your example to 3/4th hour.
They may be able to have 10 charging stations instead of 20, but the overall grid consumption will remain the same 1600-2000 kW is a lot of power and the need for dedicated power lines won't change.
Pairing stations with "local" battery buffer is a thing, as it reduces the need for local infrastructure upgrades and the systems can also help pay for themselves by acting as part of a 'virtual power plant'.
The issue here is HNers not being aware of what's being done and what is being developed in these industries...
https://ourworldindata.org/energy-mix
The problem is those who think building more wind and solar in the next few years is going to reverse this.
The issue I was getting at is that we need to build a shitload more electricity generation.
Whichever way you prefer, it's going to take longer than a couple decades.
Well, HN is not a specialised high power electricity engineers forum, though the original article is (IMHO) a little scare-mongering it seems like delivering a correct message, (in a nutshell) a lot of work for new lines and substations will be needed to be able to charge cars and commercial electric vehicles.
If really-really the transition will happen in the 2030's for passenger cars and in the 2040-2050's for trucks, it's not a bad idea to start working on these grid extensions.
> A growing number of EV-charging sites are adding batteries that can store up grid power at times when chargers are sitting idle and provide it when charging loads exceed available grid capacity, he noted. But that’s far from “the most optimized solution,” he said, particularly as loads grow to multi-megawatt scale.
Yes, but those are mostly for 'residential' / non-commercial applications. For more commercial / industrial application a new system is being developed:
> The Megawatt Charging System (MCS) is a charging connector under development for large battery electric vehicles. The connector will be rated for charging at a maximum rate of 3.75 megawatts (3,000 amps at 1,250 volts direct current (DC)).
350 kW chargers are widely used. As one example, Ionity's chargers are 350 kW: https://ionity.eu/en/weareonit
Repsol installed 400 kW chargers a few years ago: https://insideevs.com/news/375020/repsol-most-powerful-charg...
Kempower is working on new model chargers which support 400 kW: https://www.youtube.com/watch?v=aD_cvlitcIo
Alpitronic has a 400 kW charger coming out soon: https://www.linkedin.com/feed/update/urn:li:activity:6931968...
The Megawatt Charging System is the next step up for heavy vehicles: https://www.charin.global/technology/mcs/
MCS sites will start deploying soon: https://insideevs.com/news/617089/charin-megawatt-charging-s...
In the meantime you can charge your trucks and buses on existing 350 kW chargers: https://www.youtube.com/watch?v=9UAttTG03WA
Why would they need to stop to charge? Charge them on the go. See the Tom Scott video "The highway where trucks work like electric trains":
* https://www.youtube.com/watch?v=_3P_S7pL7Yg
And if they do want/have to stop, imagine charging at a rate of up to 3750 kW:
> The Megawatt Charging System (MCS) is a charging connector under development for large battery electric vehicles. The connector will be rated for charging at a maximum rate of 3.75 megawatts (3,000 amps at 1,250 volts direct current (DC)).
A freight train won't be able to deliver something to my house. Nor would it likely be able to transport livestock or grains from a farm to a processing plant.
There are medium- and short-distance trips where a truck makes more sense, and they may have to drive on a highway in that case.
And as someone who lives in Canada, where there are large distances between major metro areas, electrifying all those rail kilometres may not be practical, so even trains may have to stay on fossil fuels in certain situations.
In Europe in the 1920s, every bigger plant had direct train access, it is possible and would make a lot more sense than stuffing precious lithium in millions of trucks that will still pollute the environment. For edge cases (delivery of the last mile), there are a lot of smaller solutions available than 20t+ trucks.
Definitely the grid cannot support it today, which is why we need goals and a timeline to push ourselves rather than wait, if moving to EVs is our future. Maybe the schedule was known to be aggressive and the point of the schedule is to start now and aim high with the infrastructure, to create electricity supply simultaneously with demand, rather than wait for demand to exceed supply and then be stuck waiting for infrastructure? Either way, even if the timeline is a little too fast, and it takes another 5 or 10 years to get there, it can serve a useful purpose as a goal that aligns everyone and a catalyst that leads to action now, no? What if we’ll be late anyway, will it just take even longer if we don’t set aggressive goals? And hey, maybe we can surprise ourselves. History has many examples of how fast we can move as soon as we all agree on the goal and try hard.