The default seems to be 4 years visual inspection and 10 years periodic pressure-testing in France (I suspect it's general air compressor).
https://www.legifrance.gouv.fr/jorf/id/JORFTEXT000036128632 I don't have time to read all of that. Skiming, I see the manufacturers have a wide latitude to create their custom maintenance schedule. Interesting detail, the thresholds for inspections are given in uncompressed volume (pression*compressed volume), I guess it's directly proportional to stored energy.
I would expect a more relaxed inspection schedule in this instance because there is no significant cyclical loading of the pressure vessel, and since there is no water ingress, internal corrosion should be fine. Vibrations taken as cyclical loading can be swallowed in the bathtub curve, since you get 30000 cycles in the first second, and very little variation of stress at each cycle.
edit:
- appendix 1 if the vessel has non-corosive gas and not been de-pressurized, internal inspection is not required. Internal visual inspection only if re-pressurizing it and last visual inspection is more than 4 years old.
- you seem to be able to replace the water pressure proofing test by an untrasound test under pressure with the nominal gas, but the document describing the procedure ("Guide des bonnes pratiques pour le contrôle par émission acoustique des équipements sous pression") seems to be behind a paywall, so I don't know if it's done at nominal pressure or if you need to open the vessel