Unfortunately, the cost of building proposed power-to-gas plants is high enough that it doesn’t make economical sense to run them just a few hours a day.
You could also keep ICE engines in use without worrying about their carbon footprint. Excess renewable power turns into fuel to be used in cars, boats, trains (diesel electric freight cars), and airplanes.
Using this tech for off peak leveling on the grid might not be cost effective, but it can certainly be used to support the existing infrastructure we have to allow for a more graceful transitional period.
I have never seen an estimate on that, or a plant design detailed enough for extrapolating it. Do you know how those plants are built?