I think you want to be a bit ahead of where the technology is now to have some room for future possibilities and assuming you're pulling cable you might as well pull the "biggest" one you can(i.e. fiber). To give an analogy, we recently remodeled our kitchen, which required a rewiring of the electrical given current standards. That alone used up all the remaining circuits of our 100 amp panel. But we have several gas appliances that we eventually want to switch to electric heat-pump technology (water heater, dryer, furnace) and an EV which I'd like to have a level 2 charger for but that would most likely mean a service upgrade to 200 amps. On the flip-side, we have 1000Mbps; thinking about whether we have enough bandwidth to do X isn't even a thing now.