There’s none in the Brussel area of Belgium. In fact, we’re stuck for the foreseeable future to a grid at 3x220 (nearly the only one in the world) because it’s too costly to update the network, cabin and so on.
We’re speaking about industrial level of power delivery to charge all those EV. Things need to change at a huge scale and the operator are not ready for that.
Source ? I discussed that with my operator for high power need - their answer was to move elsewhere.