I wasnt a G5 owner, waited for the Intel switch, but I gather the G5 water cooling had a very high failure rate and this was at least a large part of why Jobs dropped IBM/MOT/PPC int he end. They promised him a high clock, air cooled G5 but couldn't deliver.