- The Cedar Viaduct, a 3,700-foot-long bridge over State Route 99 in Fresno, which features a signature double arch design².
- The Hanford Viaduct, a 3,300-foot-long bridge over the Kings River and State Route 43 in Kings County, which is the longest structure in Construction Package 2-3²⁴.
- The San Joaquin River Viaduct, a 4,700-foot-long bridge over the San Joaquin River and North Avenue in Fresno County, which includes a pergola structure to allow future trains to cross over the existing BNSF Railway tracks²³.
- The Tuolumne Street Bridge, a two-way bridge that spans the Union Pacific Railroad tracks and future high-speed rail tracks in downtown Fresno²³.
- The Fresno Trench and State Route 180 Passageway, a two-mile-long trench that will carry high-speed trains under several streets in Fresno, including State Route 180²³.
[1] https://en.wikipedia.org/wiki/Construction_of_California_Hig....
[2] https://hsr.ca.gov/about/project-update-reports/2023-project....
[3] https://hsr.ca.gov/2023/05/11/video-release-high-speed-rail-....
[4] https://www.fresnobee.com/news/local/high-speed-rail/article...
Please edit swipes like that out of your HN posts, as the site guidelines request: https://news.ycombinator.com/newsguidelines.html.
Your comment would be just fine without that bit.
Unfortunately, "high speed" is a misnomer.
This would have been high speed rail had it been deployed before 1990.
At this time it is just "rail" and when it is finished we will be back where we started: 40-ish years behind the state of the art with a product inferior to other modes of travel.
Disclaimer: I want very badly for a real HSR between SF and LA[1] and am deeply disappointed at the - sometimes comical - concessions and degradations that have accompanied this project since day one.
[1] Non-stop express service in less than 120 minutes.
https://en.wikipedia.org/wiki/History_of_California_High-Spe...
https://hsr.ca.gov/about/project-update-reports/2023-project...
"Progress continues across the 171 miles under construction and development in the Central Valley, including more than 30 active construction sites and 69 structures or grade separation projects either underway or completed."
There's your answer. It's one of the biggest reasons why it's so hard to build infrastructure and housing, even for green projects like wind farms.