I could certainly be wrong in my assumptions (hence my question!). But it still seems to me like it would be way more efficient to drill much shallower conduits in (what I assume is) the 99.999% of geography not covered by skyscrapers (and to either go deep or continue to go targeted in the remaining fraction).
These ones in fact:
https://www.google.com/maps/@56.4618615,-2.9545922,3a,75y,26...
Each pile was as about as high as the building. They pushed one in first and it went in like it was going through butter — literally seconds. They then stuck a second one directly on top which went in relatively easily. They then spent a thumping eternity putting a third one in on top of the other two. They repeated this process for days.
So, that little building is resting on piles around 2-3 times its height.
Ancedote: My neighborhood in Lousiana was a land-filled swamp. Building a single story house there required driving dozens of pylons in to keep the house from sinking into the dirt. When we put a pool into the backyard, it had to be partially filled with water while the concrete was still hardening because otherwise the surrounding water table (something like two feet below the surface) would have popped it out of the ground.
This is probably less of a concern on, say, the Colorado Plateau.
I think you probably just can't safely fully drain it.