For each delivered feature, there could be an overview, e.g.
"Users can now print reports easier. On our user request tracking platform, this issue had 321 upvotes, and 5 Premium clients requested this as well. We placed the print button THERE because amongst the three designs, this performed 23% better according to METRIC. For more info on the experiments, see link or ask on #mobile-team. The feature was released for two weeks behind a feature flag, it performed great, and we made it available for all since last Monday. 5%, of users who visited the report page used this feature and we generated already 5000 PDF reports. Big client A already complimented the feature, and it unblocked the sales process with Client B."
At the end of each email, there could be an analytics overview of the product with overall useful metrics, significant changes etc.
This format also helps with people being on holidays, sick, etc.
I'm confused by your comment. How did you decide this was something worthy of fixing if it "doesn't show any good metrics"? If you can't quantify the issue in any manner, how do you determine it's worth doing?
Because sometimes some things without metrics are incidental to the actual thing you set out to do.
E.g. a large refactor that switches libraries which is necessary for your new service that give 10% lower latency. But that library refactor will need to be done and it will take 2 months.
This is especially important when metrics would not be expected to be available -- for example, if you're designing a nuclear reactor, you need to think hard about ways to prevent a meltdown in advance, rather than collecting meltdown statistics and then fixing the piping problems that correlated with the most nuclear meltdowns.
This is also necessary when the true metric that matters is very hard to evaluate counterfactually. For example, perhaps your real task is "maximize profit for the company", but you can't actually evaluate how your actions have influenced that metric, even though you can see the number going up and down.
And necessary as well when a goal is too abstract to directly capture by metrics, resulting in bad surrogate metrics: for example, "improve user experience" is hard to measure directly, so "increase time spent interacting with website" might be measured as a substitute, with predictable outcomes that bad UI design can force users to waste more time on a page trying to find what they came for.
All of these problems are faced by metric designers, who need to pick directly-measurable metric B (UX design metric) in order to maximize metric A (long-term profits) that the shareholders actually care about, but they cannot evaluate the quality of their own metrics by a metric, for the same reason that they were not using metric A directly to begin with.
(See also the McNamara fallacy, which parent comment is a splendid example of: https://en.m.wikipedia.org/wiki/McNamara_fallacy )
Impact on end users? Nothing measurable. Impact on developers? Frustrating and slows them down, but by how much? It's impossible to say. How often does it happen? Well, difficult to count what isn't there. Would fixing the issue lead to a measurable increase in stories completed per week, or lines of code written, or employee retention? Probably not, as those are very noisy measures.
Nonetheless, that is not a fault I would tolerate or ignore.
For instance, when executives contested the efficacy of our registration form for X reasons, it became incumbent upon us to ascertain its current standing. This involved computing the ratio of registrations to site visits and conducting an in-depth analysis of the errors that users encountered while interacting with the form. We achieved this by integrating Google Analytics events with error messages, among other techniques. We provided first a picture, then we proceeded to make the changes.
This systematic approach enabled us to gain a comprehensive understanding of the situation, facilitating the implementation of purposeful changes. Subsequently, we gauged the impact of these alterations using key performance indicators (KPIs) such as the registration-to-visits ratio, and the previous events tracking changes too to understand if we really made a difference.
1. Determine whether there is supporting data for the proposed change. 2. If no data is available, implement tracking to establish a reference point. 3. Measure the reference point and ascertain what could lead to success. 4. Implement the change. 5. Review the new data and compare it against past values.