I understand that nuclear facilities are not like regular buildings and require more logistics for repairs but there's no way it would require 20 years.
I understand that nuclear facilities are not like regular buildings and require more logistics for repairs but there's no way it would require 20 years.
From: https://www.thestate.com/news/local/environment/article28022...
> The NRC, which rarely issues yellow findings, said nuclear plant operators did not resolve cracking problems from 2003 to 2022 in V.C. Summer’s diesel generator system, one of the most important backup safety systems at an atomic power plant.
which links to: https://www.thestate.com/news/local/environment/article27928...
> Federal nuclear safety officials made a discovery that was perhaps more unsettling than the problem from 2022. They identified a pattern of cracks and leaks in the plant’s emergency generator system going back 20 years. On five different occasions since 2003, the power company has been forced to repair cracks in the emergency diesel generator system, according to an agency inspection report released in August. Diesel oil leaks have focused attention on why VC Summer plant operators did not resolve the cracking problems — and how that might have affected the company’s ability to prevent a radiation leak if an emergency occurred. Officials with the Nuclear Regulatory Commission say they are concerned because the problems keep recurring. Few other nuclear plants in the Southeast have had the same number of cracking problems in diesel generator systems, say officials in the agency’s Atlanta office.
Without a true timeline of events, its hard to say for sure.
So they found cracks first in 2003, and fixed them. They found more cracks over the years and fixed them... what they have failed to do is to stop the cracking from occurring in the first place. That failure led to an even bigger crack happening during a test run of the system. According to Dominion, they plan to build a new pipe, which should fix this. The NRC seems to think they should have done this sooner, and the NRC is likely right, but I am no expert in these things.
It probably should also result in a much more throughout inspection of the plant to ensure that there are no other issues. Again, I have no expertise here.
tldr; regulatory processes prevent improvements.
I work in a highly regulated industry though not nuclear. There are obvious things to change which were approved in the site plans decades ago. Those nonsensical systems must be maintained because if they stop working for a small number of hours, everything must be stopped and there will be fines. It won't be changed because doing so requires asking regulator for approval and then everybody and their uncle gets to make a comment and even sue to stop it. Regulatory process hinders obvious good changes and improvements.
BTW, this is similar to how Los Angeles squeezed out good paying manufacturing jobs three decades ago - make it near-impossible to get electrical permit to change anything.