Wherever that happens, it is probably financially a good idea to build one of these.
But that geography is really rather rare, so the rest of the world will probably have to use gas peaker plants (environment-killing) or battery storage (expensive).
Wherever that happens, it is probably financially a good idea to build one of these.
But that geography is really rather rare, so the rest of the world will probably have to use gas peaker plants (environment-killing) or battery storage (expensive).
You only need one large lake (or a place which can be dammed to create one); the other one can be completely artificial, with no water inflow or outflow other than through the pumps/turbines. In fact, I think it might even be possible to make both reservoirs completely artificial, and fill them by pumping water from somewhere else. That makes the necessary geography a lot less rare; you only need the appropriate height difference, and the ability to create artificial reservoirs on both ends.
Pumped storage needs big lakes - a swimming pool on the top of a mountain isn't going to cut it.
Batteries can also provide grid support (frequency and voltage support when transmission or generators trip) and can be grid forming now; instead of having to follow the grid, they can drive grid health, including black start [4] when the grid is down. In South Australia, a new battery storage facility has recently come online and is in testing to enable AEMO, the grid operator, to turn down the requirement for ~70MW of constant fossil gas generation for grid services [5].
[1] https://reneweconomy.com.au/snowy-2-much-how-can-a-2-2gw-wat... ("This is the fourth time Snowy 2.0’s cost has been reset – from $2 billion in 2017, to $3.8-$4.5 billion later that year, to $5.1 billion in 2019, to $5.9 billion in 2020, to $12 billion now (2023).")
[2] https://www.energy-storage.news/global-bess-deployments-to-e... ("Global BESS deployments to exceed 400GWh annually by 2030, says Rystad Energy")
[3] https://www.teslarati.com/tesla-china-megafactory-constructi... ("Tesla’s estimated initial production capacity for the China-based Megapack factory is 10,000 units per year or about 40GWh.") [My note: This is equal to their existing capacity in Lathrop, California]
[4] https://www.nrel.gov/grid/black-start.html
[5] https://opennem.org.au/facilities/sa1/?selected=TIB&tech=bat... ("Torrens Island BESS")
There was always much better ways the money could have been spent, like investment into offshore wind, battery banks etc. but to directly invest in renewables and battery storage was and is politically untenable for that party. The Government has changed now to the party that doesn't have the same kind of direct fossil fuel investments, but unfortunatly the massive political donations from the resource industry and oil & gas to our politicians is bipartisan so they talk 'clean energy' while not that much actually changes...
The Borumba site will provide 2,000MW generation with 48GWh of storage and works are starting now.
Meanwhile Pioneer-Burdekin is currently scoped as 5,000MW with 120GWh (not a typo) of storage. Assuming it proceeds to that spec it will be the largest pumped hydro station out there.
There is water at the base of a lot of mountains, just knock the top off and build a lake.
We’d need thousands of these.
They’re great for load balancing, especially when coupled with compressed air to get them generating within seconds, but we’d have to flood all the glens of Scotland and Wales to make a dent in our needs.
However, Dinorwig, UK is far larger at 9.1 GWh, and is 40 years old.
Timelines go down as battery manufacturing scales up. TBMs and mountain cutting are not getting faster or cheaper.
I mean somebody should make a giant battery backup, but Dinorwig does have a pretty big advantage in terms of existing-ness.
[1] https://www.world-nuclear-news.org/Articles/EDF-revises-up-c...
(Add storage to offshore wind and it suddenly looks similar in cost to nuclear.)
So, no one’s suggesting replacing pump storage with giant battery banks, just spreading batteries and other storage across the grid.
We still have no technology capable of storing TWhs though, and that’s what we need to remove carbon from our power grid.
Nobody is arguing Dinorwig should be torn down. However, it took 10 years to build dinorwig. It takes less than a year to build a battery version of Dinorwig with basically 0 geographic requirements. The cost would be roughly comparable for a battery backup (at $200USD/kWh, it'd be $1.8 billion to build a similarly sized plant. or 1.4 billion GBP)
Cruachan 2 will take total site capacity to 1GWh https://www.drax.com/about-us/our-projects/cruachan-2/
> This could include the introduction by the UK Government of a ‘revenue stabilisation mechanism’ in the form of an adapted Cap and Floor scheme to support investment in long-duration storage. This would also be alongside broader consideration of how the electricity market, including the Capacity Mechanism and the Flexibility Markets, value the contribution of low carbon flexible assets such as pumped storage.
AKA... They're waiting for a government handout before they begin build. While they can 'buy low, sell high' and make a lot of money, they also want a government guarantee that they will make that much money. Payouts from that guarantee will effectively become an electricity tax.
They only started with a single lake and a moderate amount of elevation.
(Update: for those who are downvoting, it was a serious question.)
You would presumably be pumping air from one sphere to the other.
That air ends up compressing/decompressing, and therefore heating or getting cold. That dramatically lowers efficiency.
And on top of that, a football stadium sized sphere full of compressed air at the bottom of the ocean is going to need hold-down anchors at a scale the world has never seen...
https://hackaday.com/2022/02/02/underwater-tanks-turn-energy...
2. Reservoirs are very large. The lower reservoir in this article is 7 million cubic meters[1]. The Hoover dam passes 289 million cubic meters of water daily, with around 78.3 million cubic meters of that generating electricity. The largest land vehicle in the world can excavate 700k cubic meters per day[2].
[1]: https://coflein.gov.uk/en/site/423380 [2]: https://en.wikipedia.org/wiki/Overburden_Conveyor_Bridge_F60
3. We do dig them out- the reservoir in the article was substantially enlarged. But it's still rare to find places you can actually do that.
4. The upper reservoir is a totally different question. It would take over 125 years to dig out a hole the size of Lake Mead for the Hoover Dam. It would take almost a million of the bombs used the Sedan nuclear test[3] to dig that hole.
https://en.wikipedia.org/wiki/List_of_pumped-storage_hydroel...