"For the screws that popped off during the shake test, it turned out that the engineering drawings did not specify how much torque needed to be applied. That was left to the contractor, Northrop Grumman, to decide, and they were not tight enough.
“You should have a specification to make sure it’s right,” Mr. Robinson said.
The review board released its report, noting a series of issues, and made 32 recommendations. NASA followed all of them, Mr. Robinson said.
One of the recommendations was performing an audit of the entire spacecraft to identify “embedded problems” — mistakes that occurred without anyone noticing.
The engineers checked the drawings and specifications. They looked at the purchase requests to make sure that what was ordered matched the specifications and that the suppliers provided the correct items.
“There were multiple teams set up, led by the most experienced people,” Mr. Robinson said. “They really dug into the paperwork.”"